关注者

2018年10月23日星期二

ISO9001 Top Supplier Single Pipe Joint Clamp Iron Band Repair Rubber Lined Pipe ZR Band Clamp

ISO9001 Top Supplier Single Pipe Joint Clamp Iron Band Repair Rubber Lined Pipe Band Clamp

ZR-1 Stainless Steel Pipe Repair Clamp, main material is Stainless steel. You can choose the cooler you like. It used to pipe quick repairment on water ,gas,oil pipeline,etc.
Suitable Diameter(mm)
Width(mm)
PN
59-67
150,200,300,400,500,000
PN16
86-94
150,200,300,400,500,000
PN16
88-98
150,200,300,400,500,000
PN16
94-102
150,200,300,400,500,000
PN16
108-118
150,200,300,400,500,000
PN16
110-120
150,200,300,400,500,000
PN16
121-131
150,200,300,400,500,000
PN16
126-136
150,200,300,400,500,000
PN16
132-142
150,200,300,400,500,000
PN16
145-155
150,200,300,400,500,000
PN16
151-161
150,200,300,400,500,000
PN16
159-170
150,200,300,400,500,000
PN16
166-177
150,200,300,400,500,000
PN16
170-180
150,200,300,400,500,000
PN16
174-184
150,200,300,400,500,000
PN16
179-189
150,200,300,400,500,000
PN16
193-203
150,200,300,400,500,000
PN16
202-212
150,200,300,400,500,000
PN16
219-229
150,200,300,400,500,000
PN16
222-233
150,200,300,400,500,000
PN10
229-239
150,200,300,400,500,000
PN10
236-246
150,200,300,400,500,000
PN10
243-253
150,200,300,400,500,000
PN10
250-260
150,200,300,400,500,000
PN10
252-263
150,200,300,400,500,000
PN10
261-271
150,200,300,400,500,000
PN10
270-280
150,200,300,400,500,000
PN10
Application
Using in various pipe connections
Testing
Packing & Delivery
Packaging Details Each set is packed separately within plastic protecting film and then loaded into standard wooden cases. Or packed as per customers' requirements

Delivery Time Shipped in 25 days after payment
Workshop
FAQ
Q1. Where i can use the pipe repair coupling?
A1. Application Area: Surface and Underground project, Shipbuilding and Off shore oil platform, Water and gas also Fuel Supply, Electrical and Industrial Production, Drainage and Maintenance Pipeline projects.

Q2. How long is your production time?
A2. The pipe repair fittings can finish production in 3-7 working days when quantity under 100 pcs.
Quantity over 100 pcs, need 7-15 working days around. 

Q3. How long is your delivery time ?
A3. Generally it is 3-7 days by express. or it is 20-30 days by air or by sea.

没有评论:

发表评论